Skip to content
FREE Shipping on Trial Kits
Acid Stain

Podcast: Tips for Pouring Acid Stain Ready Concrete

Direct Colors DIY Home Improvement · Episode 18

Listen to this episode

Ready-mix plants add things to concrete that quietly destroy your ability to stain it later — fly ash, retarders, accelerators, curing compounds. None of them are essential. Shawna Turner on calling the plant for the mix design before the pour, why you want a hand or light machine trowel finish rather than a hard one, and how to protect the slab through the rest of the build.

5 min 46 sec · Download MP3 (7.9 MB)

For this job you need: EverStain™ · CitrusEtch™ · ProWax Polish™

Not sure which is right for your slab? Send us the details — the free project consultation is a person, not a form letter.

The written guide on this topic, with photographs: Pouring Colored Concrete Slabs.

Editor’s note. This episode was recorded some years ago. The transcript below has been corrected where the facts have changed; nothing about the technique has been altered.

  • “Hard Trowel Floor Prep” is now CitrusEtch™, and the “Sprayable Satin Finish Concrete Sealer” is now EasySeal™ Satin. The concrete wax is ProWax Polish™.
  • Direct Colors no longer sells that polyurethane, so the suggestion to apply one instead of wax is no longer something we can supply. The wax route is current.
  • The two new-construction episodes disagree on two numbers. (1) This one says cover the sealed floor again after six hours; episode 24 says at least ten. (2) This one puts the cure at 20–28 days; episode 24 says 30. Both are left as spoken. Take the longer figure in each case — and note that the real test for curing is the one given here: a uniform light gray, not a date on the calendar.
  • The sign-off’s RSS-feed line and social links have been dropped — the list included Google+, which shut down in 2019, and Twitter, now X.
  • ⚠ Direct Colors does sell a polyurethane again — ThaneForce™ High Gloss, for professionals only. It is not available to buy online and has no product page: call (877) 255-2656 to buy. It comes in 3 gallon and 15 gallon. The specific products named in this episode are still discontinued — this is a different sealer, not a reissue.
  • Housekeeping, applied to every episode in this archive. The spoken sign-off has been rewritten to point here rather than at the old directcolors.com/listen address. The RSS-feed line, the social-media list and any pointers to retired photo-gallery, blog or video pages have been dropped, along with pointers to pages that have since been retired or superseded by the links under What’s Next — in some episodes that removes a whole sentence or a short exchange. Every speaker says “design consultation”; the service is now called the free project consultation, and we have used the current name throughout rather than send you to a page that no longer exists. Run-on speaker turns, duplicated intro lines and obvious transcription slips have been repaired without changing meaning. Nothing bearing on technique, safety or product choice has been altered; those changes are itemized above.

Still accurate and still the most useful part: no retarders, no accelerators, no more than 10% fly ash, no topical curing compound unless it self-dissipates within two weeks, a hand or light machine trowel finish, and a 20–28 day cure to a uniform light gray.

What to use for this today

The polyurethane alternative to wax is discontinued. The current finishing route is:

First and final sealer coats
EasySeal™ Satin — it re-emulsifies, so the second coat repairs the first.
Protect the finish
ProWax Polish™, three coats.
If the slab comes back too smooth
CitrusEtch™ opens it after the fact.

Full transcript

Amie Nolen: Not all concrete is created equal. Increasingly, ready mix companies are including additives like fly ash in the concrete that can interfere with the acid staining process. With more and more people interested in pouring acid stain ready concrete, we’ve got a few tips and recommendations to make that process easier and more successful. I’m joined by Shawna Turner, General Manager with Direct Colors, to find out best practices for pouring acid stain ready concrete. Welcome, Shawna.

Shawna Turner: Thank you.

AN: What’s the first thing a customer needs to do to get started?

ST: The first thing to do is have a conversation with your general contractor. Make sure he or she understands your plan to acid stain and what that means for the overall construction process. Preparing to acid stain begins before the concrete is poured, so it should be discussed with the general contractor in the planning stage.

AN: You mentioned preparing to acid stain before pouring the concrete. What does that mean?

ST: Well, not all concrete is created equal. Depending on where you live, concrete can contain additives and/or fly ash that negatively impact the acid staining process, so it’s imperative that you know what’s going in your concrete BEFORE it’s poured. How do you do that? Either the homeowner or their contractor needs to call the ready mix company pouring the concrete to ask for the mix design details. The concrete should not include retarders, accelerators or more than 10% fly ash if it is to be successfully acid stained later. None of these additives are essential, but are often used when temperatures are very hot or cold, and to cut costs in the case of the fly ash. I’d also avoid using a topical curing compound unless it is self-dissipating and will evaporate within two weeks of application.

AN: That’s very helpful information. What about finishing the concrete? I know that’s also an important part of the process.

ST: You’re right. Finishing the concrete properly will yield better final staining results. The best option for indoor floors or patios is either a hand-troweled or light machine-troweled finish. Stamping or texturing concrete is fine too if you’re working outside. The objective is to avoid making the concrete so smooth that acid stain can’t readily absorb into the pores. If the stain can’t absorb, the chemical reaction will not occur and the stain will simply wash off during the cleaning process. No one wants that to happen. Overly smooth concrete can be corrected using CitrusEtch™ after the fact if needed.

AN: When should a customer plan to acid stain the concrete?

ST: We usually don’t recommend acid staining until the concrete is fully cured, or achieves a uniform light gray color. That could occur anytime after 20–28 days depending on weather conditions. The concrete will need to be protected throughout the construction process. Overlapping cardboard works best to cushion blows and absorb spills should they occur. Spills and other contaminants on unprotected concrete only make the home or business owner’s job that much harder when it’s time to stain. Again, remind your GC to talk to every contractor about not marking the floor or making a mess. Covering the floor can make a big difference, but nothing’s better or more effective than a conscientious contractor.

AN: In the case of interior floors, at what point in the construction process would you acid stain?

ST: The best time to uncover, clean, acid stain and seal the floors is after the drywall has been hung but has not yet been mudded in. Drywall mud is notoriously difficult to get off of concrete. Staining and sealing before that step is the better option for sure. Once the floors have been stained, neutralized and cleaned, apply one coat of sealer. I prefer EasySeal™ Satin because it’s so easy to apply and dries quickly. Six hours after application, cover again with overlapping cardboard and continue with construction.

AN: At what point should the finishing coats of sealer and wax be applied?

ST: Just before the baseboards are installed, remove the cardboard, clean thoroughly and apply another coat of sealer. The second coat of sealer will repair most minor scratches on the surface and add additional luster. 24–48 hours later apply three coats of concrete wax and allow to dry for 24 hours before moving in furniture. I highly recommend our guide on care and maintenance of acid stained floors — please give that a read before moving in, to avoid unnecessary damage to the floors.

AN: Thanks for this essential staining advice for new construction floors. If you have questions, call one of our expert technicians at 877-255-2656 and we’ll help you select the best products and technique for your needs. If you prefer email, send in a free online project consultation and we’ll get back to you within 24–48 hours. Direct Colors DIY Home Improvement podcasts were produced twice monthly for your enjoyment, and the show notes live here in the Direct Colors listening archive. Thanks again for joining us!

What’s Next

  1. The written guide → Pouring Colored Concrete Slabs
  2. The companion episode → Acid Staining Floors During Construction
  3. Coloring the mix → Integral Color · Integral Color Concrete
  4. After it is down → Care & Maintenance of Acid Stained Floors
  5. Shop → EverStain™ · CitrusEtch™ · ProWax Polish™
Previous Post Next Post

Before You Checkout

EasyTint™ and OxiGrip™ are not compatible when used together directly. For slip resistance, use EasyTint™ as the color layer and apply OxiGrip™ only with a clear solvent based sealer as the topcoat.

Before You Checkout

AcquaTint™ and OxiGrip™ are not compatible when used together directly. If you need added slip resistance, apply AcquaTint™ as your color layer first, then use OxiGrip™ in a clear topcoat with AcquaSeal™ or HydroCryl™.